Arete Technologies -- Software methodology (Software Development Life Cycle) and Website methodology (Website Consultancy, research and development)
Arete Technologies
Bridging perceptions to reality
Request for proposal | Feedback  
leftmeth
About us
Sector expertise
methodology_content
Home arrow arrow About us arrow Arete Methodology Methodology
Website
Website consultancy, research and development:

Arete shall perform extensive research and submit a presentation on various options that can be made available on the website for achieving the objectives of client as listed.

Information Collection :

Arete shall collect and collate the information from various Departments through one point of contact. The information would mostly be in soft format (Doc, PDF, GIF etc) form, and some in manual format. The indicative list of information is as under

      • Department information that needs to be displayed on the web site
      • Press releases
      • Monthly/ Quarterly/ Yearly progress reports
      • Pamphlets, flyers on development plans, schemes
      • Rules, procedures & Acts etc
Digitization of collected Information:

The information and forms collected from various divisions shall be converted into appropriate and desired electronic format as indicated below, when ever required:

  • PDF/ DOC
  • HTML, PDF, DOC
  • HTML, Flash, PDF, DOC
  • SQL, MS-Access
Uploading of information on servers:

Arete shall get the information approved from concerned Division heads through a single point of contact and after approval upload the information onto designated servers with proper hyper links to provide full proof navigation to the users through web enabled platform. Each set of information content must be self-contained and must conform to pre-decided nomenclature in file naming scheme

Collection of feedback:

Arete shall post feedback forms wherever relevant to collect feedback from citizens to ascertain the relevancy and usefulness of the information being hosted on the web site.

Software
Project Initiation

We develop the functional and technical architecture of the system, in context of achieving the high level of integration and security. This includes initiating first time interaction with the customer and establishing a base for future discussions and project scope review

Requirement Analysis

The phase involves evaluating the scope of work and functional specifications of the project, holding discussions on level-1 functional issues, preparation of proposal and signing off after accepting on a mutually agreed proposal or customer requirement document.

Design

The phase involves designing of the database, developing the system interfaces based on the project plan.

Development and Code Test

The development and coding of respective modules is carried out in this phase. Functional code test is performed during the development phase to check the consistency of the functionality in accordance with the project specifications. The customer is involved in weekly test schedules and weekly progress reports of the progress are also provided.

Quality Test and Release

Once the development and coding is over, the customer performs rigorous testing for functional and technical issues. Any bugs arising are solved and the project is accepted for release.

Unit Testingà Module Testing à System Testing à

Implementation

The project is made live for production on the desired environment and tested for any showstopper issues arising out of platform issues

Post Implementation Support

Depending on the project agreement, the customer can avail of post implementation support for a desired duration. Usually Arete provides 40 hours of free technical support to cover any issues arising out of the project owing to bugs. However, Dynamic Web provides a maintenance contract to customers who wish to avail our services post implementation. The nature of technical support is flexible depending on customer requirement.


Copyright 2005 - 2007 © Arete Technologies (P) Ltd.